MIL-STD-1916
relieve the contractor of responsibility for assuring that all products or supplies submitted to the
Government for acceptance conform to all requirements of the contract.
1.5 Limitations. The sampling plans and procedures of this standard are not intended for use with destructive tests or where product screening is not feasible or desirable. In such cases, the sampling plans to be used will be specified in the contract or product specifications.
2
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business