MIL-STD-2106A(SH) APPENDIX A
A.3.4 Test stage examples.
A.3.4.1 Stage two examples. The following are examples of stage two tests:
a. Cable integrity verification and insulation resistance checks. b. Hydrostatic tests of piping systems.
c. Coolant flushing.
d. Lubrication of components before operation. e. Inspect and clean air filters and air intakes.
f. Pre-energizing tests.
g. Reference planes and benchmark verification.
A.3.4.2 Stage three examples. The following are examples of stage three tests:
a. Equipment element level initial light off, diagnostic and functional tests. b. Hinged/retractable mast operational test.
c. Machinery spaces lifting gear demonstration. d. Shaft torsion meter performance test.
A.3.4.3 Stage four examples. The following are examples of stage four tests:
a. Intrasystem tests of two or more elements in the same system. b. Propulsion seawater cooling system operational test.
c. Auxiliary propulsion system operational test.
d. Diesel generator parallel and reverse power load bank test. e. System local area network interface test.
f. Navigation system alignment verification.
g. Sound powered telephone system operational test.
A.3.4.4 Stage five examples. The following are examples of stage five tests:
a. Intersystem interface tests.
b. Search radar distribution and display interface test. c. SPS-73 external interfaces.
d. AN/SPQ-9B video and trigger verification. e. AN/SPN-41A stabilization verification.
f. Integrated propulsion test.
A.3.4.5 Stage six examples. The following are examples of stage six tests: a. Propulsion gas turbine engine removal and replacement demonstration. b. EMI Phase I test (dockside).
c. HULL generated IMI test.
d. Data Link operational demonstrations dockside. e. Navigation system certification (dockside).
f. SSDS MK 2 MOD 4B combat system integration test.
24
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business