MIL-STD-2106A(SH) APPENDIX B
TEST TITLE: TEST NO: REV/CHG:
GENERAL INFORMATION
7. SPECIAL CONDITIONS AND SERVICES:
[Identify any special or unique support services, facilities, or conditions required for test conduct; e.g., air, water, electrical services, dry-dock, and support ships or aircraft. Include detailed requirements for services.]
8. EQUIPMENT INVOLVED IN TEST:
[List all shipboard installed equipment involved in the test. When a complete system is involved, the system is listed and not the individual components; e.g., AN/SPS-48E. When more than one type of equipment may be used, identify alternatives and use generic name in TESTING STEPS. For example, if gyro heading is obtained from an AN/WSN-5 on one ship and from the AN/WSN-7 on another ship, both alternatives should be listed and testing steps should refer to "Ships Heading" rather than "WSN-7 Output."]
9. CONFIGURATION:
[List specific system configurations that the test procedure was engineered to support, or APL number(s) of the equipment or system to which the test applies.]
10. METHOD:
[Explain briefly in narrative form the scope of the test and generally how the test is to be performed. Include functions tested, modes of operation of major equipment, intended use of test equipment, special support services, and facilities. Avoid redundancy with the test objective paragraph.]
[Test method section should be brief and not include references to other documents. The method may be divided into subtests for convenience and clarity.]
11. STATION ASSIGNMENTS:
STATION NO. PERSONNEL COMMENTS
[List all stations by the component name that must be manned to perform the test. Indicate the number of personnel including the test conductor, and each technical discipline (e.g., electrician, pipefitter, electronic technician) required at each station. Station assignments should provide an indication of the total number of personnel required to conduct the test; therefore, if one person can reasonably man more than one station, this should be clearly indicated.]
12. SUPPLEMENTAL INFORMATION:
[If additional administrative information would be helpful to conduct of the test, such as a list of abbreviations, or a list of definitions/glossary information for key technical terms, that information may be added to the general information as paragraph "12. Supplemental Information". Equipment set up information (for example, tables of settings for dip switches), should not be listed here, but rather should be provided in the Initial Conditions and Setup pages or Test Step pages, or may be added as an Appendix at the end of the test procedure. See B.3.3 for details on test procedure appendices and addendums.]
FIGURE B-7. General information format and content (sheet 2 of 2).